New achievements
With the academic year 2010/2011 we can emphasize the reception of the following structures:
- 8000 teaching places at the Chetma pole, seat of the Faculty of Humanities and Social Sciences and the Faculty of Law and Political Science
- A research center at the Central University (12 premises for research labs).
- A university restaurant (2400 meals / day) within the central university
- A health center
research center
Faculty of Law and Political Science at the Chetma Pole
The university restaurant
The health center
Renovation and development of old buildings
Renovation work and development of old buildings were carried out within the central university and affected in particular:
- Part of the old architectural studios have been refurbished and converted into a modern video-conference room
- The other part has been converted into an audio-visual center
- Renovation of six old amphis.
- Transformation of the old library into 5 large rooms with a capacity of 120 seats each
- Renewable Energy Laboratory
- Technology Hall
Equipment:
With regard to the acquisition of scientific and educational material, the following operations can be mentioned:
- Equipping the Computer Center with powerful hardware.
- Equipping the audio-visual center and the videoconferencing room
- The final acquisition of the scanning electron microscope (SEM).
- Equipping the educational laboratories: biology, industrial chemistry, mechanics, civil engineering and architectural workshops